Action Plans

Action Plan for the Blanding’s Turtle (Emydoidea blandingii), Nova Scotia Population, in Canada

The Minister of Environment and Climate Change and Minister responsible for the Parks Canada Agency is the competent minister under SARA for the Blanding’s Turtle, Nova Scotia population, and has prepared this action plan to implement the recovery strategy, as per section 47 of SARA. To the extent possible, it has been prepared in cooperation with the Nova Scotia Department of Natural Resources, the Blanding’s Turtle Recovery Team, Indigenous groups, and environmental non-government organizations, as per section 48(1) of SARA.

Consultation period: 2019-08-01 to 2019-09-30

File(s)

Get Adobe Reader

Contact Person(s)

Recovery Planning
Environment and Climate Change Canada
15th Floor, Place Vincent Massey
351 St.Joseph blvd.
Gatineau, QC
K1A 0H3
Send e-mail


Related Species

Links

  • No links available.
Date modified: